Architects & Engineers · Code Updates
Electrical code updates in our markets
Which edition of the electrical code is in effect where you're designing, when it changed, and the changes that most often affect commercial Division 26 work. Kept short on purpose and linked to the official sources.
Where things stand
Electrical code in effect, by jurisdiction
The edition in effect depends on where the project is and when it's filed. Local amendments and transition periods apply, so confirm with the authority having jurisdiction before you issue documents.
| Jurisdiction | Our territory | Electrical code in effect | Effective | Good to know |
|---|---|---|---|---|
| New York City | NY | 2025 NYC Electrical CodeNYC amendments to the 2020 NEC | Dec. 21, 2025 | NYC has its own electrical code, separate from the state Uniform Code. NYC Buildings ↗ |
| New York State outside NYC | NY | 2025 NYS Uniform CodeBuilt on the 2024 I-Codes, which reference the 2023 NEC | Dec. 31, 2025 | Confirm the NEC edition with the local code official. NYS Dept. of State ↗ |
| New Jersey | NYPHILLY | 2023 NECUCC electrical subcode, with NJ amendments | Aug. 17, 2026 | Six-month grace period after adoption. NJ DCA adoption ↗ |
| Pennsylvania statewide UCC | PHILLY | 2021 I-CodesReferencing the 2020 NEC | Jan. 1, 2026 | Some projects with contracts signed before the update can use the prior code if filed within six months. PA UCC ↗ |
| Philadelphia | PHILLY | 2021 codes, 2020 NEC | Jan. 1, 2026 | Applications before July 1, 2026 could use the 2018 or 2021 codes. From July 1, 2026, the 2021 codes are required. L&I bulletin B-2501 ↗ |
| Delaware | PHILLY | Varies by jurisdiction | Varies | Adopted at the county and municipal level. Check with the AHJ, or ask us and we'll help you find out. |
| Maryland | DC | Varies by county | Varies | Electrical code adoption is local. Check with the county AHJ, or ask us. |
| Washington, DC | DC | 2017 DC Construction CodesDOB lists the 2014 NEC as the base | May 29, 2020 | Watch DOB for the next code cycle. DC DOB ↗ |
| Virginia | DCPYROTENAX ALL VA | 2021 Virginia USBCWith the 2020 NEC | Jan. 18, 2024 | Our DC territory covers Northern Virginia; Pyrotenax is statewide. Virginia DHCD ↗ |
Last reviewed October 14, 2026. Dates and editions are taken from the official sources linked in each row.
What changed
Changes that show up most in commercial work
A short list, not a complete one. These are the changes we see raised most on Division 26 drawings as our markets move to the 2020 and 2023 NEC. Where a line we represent fits, we say so. Where none does, we don't force it.
GFCI protection now reaches bigger receptacles in commercial spaces
Starting with the 2020 NEC, GFCI protection in non-dwelling occupancies covers more than standard 15 and 20 A receptacles.
What changed
- Applies to receptacles on single-phase circuits up to 50 A and three-phase circuits up to 100 A, at 150 V to ground or less.
- Covers listed locations such as kitchens, bathrooms, rooftops, outdoors and areas near sinks.
What to review in your design
- Receptacles for kitchen equipment, rooftop units and other larger loads in those locations.
- How GFCI protection will be provided: at the device or at the breaker.
- Your receptacle and panel schedules, so bidders price the protection.
Relevant line we represent · NY · Philly territoriesLegrand Pass & Seymour: spec-grade, tamper-resistant self-test GFCI receptacles.
BBA page →Tamper-resistant receptacles in more commercial occupancies
The 2020 NEC added many non-dwelling occupancies to the list of places that need tamper-resistant receptacles.
What changed
- Adds hotel guest rooms, child care, preschool and education facilities, and dormitories.
- Adds business offices, corridors and waiting rooms in clinics and medical, dental and outpatient facilities.
- Adds assisted living and assembly spaces such as transit waiting areas, gyms and auditoriums.
What to review in your design
- Device specs for schools, healthcare offices, hotels and residence halls.
- Renovation scopes in those occupancies where receptacles are replaced.
Relevant line we represent · NY · Philly territoriesLegrand Pass & Seymour: tamper-resistant receptacles, including self-test GFCI versions.
BBA page →Surge protection on more services and on emergency systems
Surge-protective devices moved from optional to required in several places, and the 2023 NEC widened the list.
What changed
- 2020 NEC: services supplying dwelling units need a Type 1 or Type 2 SPD, including when service equipment is replaced (230.67).
- 2023 NEC: extends that to dormitory units, hotel guest rooms and suites, and nursing home patient sleeping rooms.
- 2020 NEC: emergency system switchboards and panelboards need a listed SPD (700.8).
What to review in your design
- Service equipment schedules for multifamily, hotels, dormitories and senior care.
- Emergency distribution in any building with an emergency system.
- Which edition applies: a 2020 jurisdiction and a 2023 jurisdiction differ here.
Relevant line we represent · All three territoriesnVent ERICO: surge protective devices, including Type 1 service entrance suppressors listed to UL 1449 Edition 4.
BBA page →Official sources
Go to the source
Every date and edition on this page comes from one of these.
- NFPA free accessRead the NEC edition your project uses↗
- NYC Electrical CodeNYC Department of Buildings↗
- NYS Uniform CodeNYS Department of State↗
- New Jersey UCC adoptionNJ Department of Community Affairs (PDF)↗
- Pennsylvania UCCPA Department of Labor & Industry↗
- Philadelphia code bulletinL&I bulletin B-2501 (PDF)↗
- DC construction codesDC Department of Buildings↗
- Virginia codesVirginia DHCD↗
Not sure how a change hits your spec?
Send us the section or the project details. We'll review it for the lines we represent and point you to the manufacturer's technical team when the question goes beyond us.
This page is a summary for design professionals, not a complete list of code changes, and it isn't legal or code-compliance advice. Requirements depend on project scope, filing dates, transition provisions and local amendments. Confirm the governing requirements with the authority having jurisdiction and the adopted code text. Product information is drawn from manufacturer materials; confirm current listings with the manufacturer.